blogs

  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /home/squtch/drupal-5.23/includes/file.inc on line 646.
  • : preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/squtch/drupal-5.23/includes/unicode.inc on line 311.
  • : preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/squtch/drupal-5.23/includes/unicode.inc on line 311.

kitchen remodel #65

Pictures from the fourty-eighth day of the remodel:

Refrigerator (right) and freezer (left) installed.

Baseboard trim near back door.

Trim around slider to dining room and baseboard trim.

Trim around linen cabinet in dining room. This cabinet goes into the dead space corner to the right of the range and the left of the main sink.

kitchen remodel #64

Pictures from the fourty-seventh day of the remodel:

Cabinet toe-kick trim to the left of the range.

Cabinet toe-kick trim below the main sink.

Cabinet toe-kick trim to the right of the main dishwasher.

Cabinet toe-kick trim to the right of the second dishwasher.

Cabinet toe-kick trim along the backside of the peninsula.

kitchen remodel #63

Pictures from the fourty-sixth day of the remodel:

View across the kitchen from the stairs up to the loft.

View across the kitchen toward the stairs up to the loft.

Shot across the freshly sealed granite counter-top.

Another shot across the freshly sealed granite counter-top.

Freshly sealed slate threshold out the back door.

Freshly sealed slate threshold out the front door.

kitchen remodel #62

A few pictures from the fourty-fifth day of the remodel.

View across the kitchen from the stairs up to the loft.

View across the kitchen toward the stairs up to the loft.

Low-voltage transformer for overhead lights installed and boxed.

Exhaust chase trimmed in cherry.

Main dishwasher installed.

kitchen remodel #61

A picture from the fourty-fourth day of the remodel.

The range is in.

The floor also got finished but it was all covered up before the range went in.

First Prev Next

kitchen remodel #60

One picture from the fourty-third day of the remodel.

Floor started going down in the kitchen.

First Prev Next

kitchen remodel #59

Pictures from the fourty-second day of the remodel.

View across the kitchen from the stairs up to the loft.

View across the kitchen toward the stairs up to the loft.

Low voltage light transformer under second sink.

Low voltage light transformer under main sink.

All three low voltage over head lights over second sink.

Dining room floor is down.

kitchen remodel #58

Pictures from the fourty-first day of the remodel:

View across the kitchen from the stairs up to the loft.

View across the kitchen toward the stairs up to the loft.

An outlet is now in to the left of the second sink.

An outlet is now in to the right of the second sink.

The floor is going in starting in the dining room.

kitchen remodel #57

Pictures from the fourtieth day of the remodel:

View across the kitchen from the stairs up to the loft.

View across the kitchen toward the stairs up to the loft.

Lights over the main sink are installed.

Under cabinet lights to the left of the range are installed.

Fan & light installed in the loft.

Kitchen/diningroom sliding door pull installed.

kitchen remodel #56

Pictures from day thirty-nine of the remodel:

View across the kitchen from the stairs up to the loft.

View across the kitchen toward the stairs up to the loft.

Backsplash to left of range is grouted.

Backsplash next to main sink corner is grouted.

Backsplash to the right of the main sink is grouted.

Backsplash in the second sink corner is grouted.

kitchen remodel #55

Pictures from day thirty-eight of the remodel:

View across the kitchen from the stairs up to the loft.

View across the kitchen toward the stairs up to the loft.

Tile threshold at back door into kitchen.

Tile backsplash and second sink.

Disposal and water filter under second sink.

Tile backsplash and main sink.

Disposal and water filter under main sink.

The first frost is coming tonight

With the wet summer, most of the garden got a slow start this year, but August and September provided us with a lot of fresh produce. The cherry tomatoes have been going gangbusters, loads of chiles set, but few turned their mature color. Tonight is supposed to bring the first frost of the year, so after school, both me and Laurie spent a lot of time out in the garden picking just about everything that is frost sensitive. There just isn't room in the garage this year to pull and hang the tomato plants, so we picked every tomato that has even a little bit of color and put them in paper bags. Laurie picked our last couple pounds of pole beans, and I picked about 10 pounds of tomatillos.

kitchen remodel #54

Pictures from the thirty-seventh day of the remodel.

View across the kitchen from the stairs up to the loft.

View across the kitchen toward the stairs up to the loft.

Backsplash tile being worked on near the second sink.

First Prev Next

kitchen remodel #53

Pictures from the thirty-sixth day of the remodel.

First Prev Next

kitchen remodel #52

Pictures from the thirty-fifth day of the remodel:

View across the kitchen from the stairs up to the loft.

View across the kitchen toward the stairs up to the loft.

Closer look at the slate backsplash going in.

First Prev Next

kitchen remodel#51

Pictures from day thirty-four of the remodel:

View across the kitchen from the stairs up to the loft.

View across the kitchen toward the stairs up to the loft.

Pocket door to the dining room is installed.

Trim around the loft window is finished.

Trim around bedroom window is finished.

kitchen remodel #50

Pictures from day thirty-three of the remodel.

View of the newly tiled entry.

Another view of the newly tiled entry.

Window of second sink has been trimmed.

Window over main sink has been trimmed.

New skylight has been trimmed.

Existing skylight has been trimmed.

kitchen remodel #49

Pictures from day thirty-two of the remodel:

View across the kitchen from the stairs up to the loft.

View across the kitchen toward the stairs up to the loft.

Closer look at the main sink wall from the end of the peninsula.

Closer look at the second sink wall from across the peninsula.

kitchen remodel #48

Picture from day thirty-one of the remodel.

Couple more support bars and the cabinet doors on either side of the bars were swapped.

First Prev Next

kitchen remodel #47

Pictures from day thirty of the remodel:

View across the kitchen from the stairs up to the loft.

View across the kitchen toward the stairs up to the loft.

Some of the support bars are in for the counter top ledge.

Crack stop membrane on the floor where the slate will go down.

Syndicate content